| This project
consisted of renovating two standpipes owned and operated by the City
of Gonzales. The first phase consisted of minor structural modifications,
replacement of the interior coating and installation of a cathodic
protection system for a 1.5 million gallon standpipe. As part of the
project, safety climb equipment was upgraded and a drain line was installed
on the tank. The interior of the standpipe received a "Near White" blast
cleaning and three coats of Polyamidoamine Epoxy. A dehumidifier unit was
utilized for interior climate control.
The second phase of
the project involved interior and exterior renovation of a 2.5 million
gallon standpipe. Structural modifications included replacement of safety
climb equipment, replacement of roof vent and installation of a reinforced
"door sheet" for the interior renovations. The interior of the standpipe
received a "Near White" blast cleaning and three coats of Polyamide Epoxy.
The exterior of the tank received spot "brush blast" and high-pressure water
blast followed by two coats of "direct to metal" Hydrophobic Acrylic
Polymer. After coating operations were completed, a new electrical system
including obstruction light and cathodic protection system was installed.
|