Burnet 15-Inch Wastewater Interceptor
|
| PROJECT NAME: | 15-Inch Wastewater Interceptor |
| LOCATION: | Burnet, Texas |
| OWNER: | City of Burnet |
| YEAR COMPLETED: | 2005 |
| CONSTRUCTION COST: | $600,000 |
| OWNER REPRESENTATIVE: | Michael Steele, City Manager |
| | 512.756.4858
|
| PROJECT DESCRIPTION: | The project
involved installing approximately 5,900 L.F. of 15-inch sewer and 1,300 L.F. of 12-inch sewer at depths of 8 feet to 28 feet and included one railroad boring. The project intercepted an existing sewer to save existing downstream line capacity for future development and conveyed this wastewater through an adjoining drainage area to the wastewater treatment plant. The new sewer line opened the eastern side of Burnet for new development and conserved line capacity in the central area of Burnet for future development.
|
| SERVICES PROVIDED: | Preliminary Engineering, Design, Bid and Construction Phase Services. |
|