| PROJECT NAME: | Wastewater Treatment
Plant Reclaimed Water Reuse |
| LOCATION: | Holland, Texas |
| OWNER: | City of Holland |
| YEAR COMPLETED: | 2007 |
| CONSTRUCTION COST: | $217,000 |
| OWNER REPRESENTATIVE: | Kathleen
Vrana, City Administrator |
| | 254.657.2460
|
| PROJECT DESCRIPTION:
| The WWTP
Reclaimed Water Reuse project entailed construction of reclaimed water reuse facilities on and
adjacent to 102 acres of the city wastewater facility and parklands enabling
Holland to utilize reclaimed water for agricultural, recreational, and open
space irrigation in lieu of discharge to an area stream. The reclaimed water
reuse authorization and construction gave Holland the means to improve
permit compliance, protect and improve the receiving stream habitat, obtain
revenue from hay production, conserve potable water, and enhance parkland,
athletic facilities, and open spaces. Authorization for citywide reclaimed
water reuse was obtained from the Texas Commission on Environmental Quality.
The initial phase of construction included a 400 gpm reclaimed water pumping
station, 10,660 feet of six-inch irrigation piping, 39 irrigation risers,
four
portable Big Gun sprinkler heads, fencing, gate, controls, and electrical.
|
| SERVICES PROVIDED: | Preliminary
Engineering, Permitting, Final Design Services, Bid Phase Services and
Construction Phase Services. |
|